Montgomery White Oak Apartments
Green Energy Conversion and Building Systems Modernization
11550 Stewart Lane, Silver Spring, Maryland
Montgomery White Oak Apartments · TEC project photographyCoordinated engineering. Practical improvements.
TEC provided mechanical and electrical engineering design services to replace gas-fired central boiler plants and electric chiller systems with individual, energy-efficient, 19 SEER2 variable refrigerant flow (VRF) heat pump systems. Domestic hot water production was upgraded to 95% efficient condensing natural gas water heaters.
The challenge
Modernize heating, cooling, and domestic hot water systems across a community of mid-rise, townhouse, and garden-style apartment buildings through a coordinated, three-phase project.
TEC’s approach
- Develop coordinated mechanical and electrical design documents for all three phases.
- Replace central heating and cooling with individual 19 SEER2 electric VRF heat pump systems.
- Upgrade domestic hot water production with 95% efficient condensing natural gas water heaters.
- Enable decommissioning of the central plants and elimination of underground distribution piping.
Three-phase project scope
- Phase I — A seven-story mid-rise apartment building, three townhouse buildings, and garden-style apartment buildings.
- Phase II — Six garden-style apartment buildings.
- Phase III — Six garden-style apartment buildings.
Modernization outcomes
The modernization decommissioned two central heating, cooling, and domestic hot water plant systems and eliminated five miles of underground water piping. TEC reports an improvement in overall energy efficiency from 65% to 95% and an estimated annual reduction of approximately 1,200 metric tons of carbon emissions.
Montgomery White Oak slideshow.

