Carey House Apartments
All-Electric Conversion and Building Systems Modernization
1431 North Carey Street, Baltimore, Maryland
Carey House Apartments · TEC project photographyCoordinated engineering. Practical improvements.
TEC is providing mechanical and electrical engineering design for the all-electric conversion of Carey House Apartments, a four-story, 23-unit residential building in Baltimore. The design replaces central gas-fired boiler plants with individual, energy-efficient, 19 SEER2 variable refrigerant flow (VRF) heat pump systems and provides individual electric domestic hot water heaters, electric stoves, and appliances.
The challenge
Coordinate the transition from central plant infrastructure to individual electric building systems while integrating heating, cooling, domestic hot water, apartment equipment, and electrical distribution within the existing residential building.
TEC’s approach
- Develop coordinated mechanical and electrical design documents for the all-electric conversion.
- Design individual 19 SEER2 electric VRF heat pump systems to replace the central gas-fired boiler plants.
- Provide individual electric domestic hot water heaters and coordinate electric stoves and appliances for the apartments.
- Coordinate electrical distribution and equipment power requirements with the mechanical modernization.
- Analyze the building envelope and mechanical and electrical systems to support Maryland’s Multifamily Energy Efficiency and Housing Affordability (MEEHA) program.
Projected modernization benefits
The planned modernization supports decommissioning the existing central heating, cooling, and domestic hot water plant systems. TEC’s project narrative estimates an improvement in overall energy efficiency from 60% to 95% and an annual reduction of approximately 350 metric tons of carbon emissions. These are projected benefits of the current electrification conversion project.
Carey House project slideshow.