FEATURED PROJECT / Clean Energy & ElectrificationView photo slideshow
The Warwick Apartments
High-rise building electrification
Silver Spring, Maryland
The Warwick Apartments · TEC project photographyTHE PROJECT
Coordinated engineering. Practical improvements.
TEC designed mechanical and electrical systems upgrades for this 401-unit, 20-story residential building, replacing the central boiler and chiller systems with individual 19 SEER2 VRF heat pumps and upgrading domestic hot water with 95% efficient condensing water heaters.
401Apartment units
20Stories
19 SEER2VRF heat pumps
95%Water heater efficiency
01
The challenge
Replace aging central heating, cooling, and domestic hot water infrastructure with efficient systems suited to a large multifamily building.
02
TEC’s approach
- Replace central heating and cooling with individual variable refrigerant flow (VRF) heat pump systems.
- Upgrade domestic hot water production with 95% efficient condensing water heaters.
- Coordinate the electrical infrastructure required for the mechanical modernization.
- Enable decommissioning of the central heating, cooling, and domestic hot water plant.
03
The design perspective
A coordinated building modernization that connects efficient HVAC equipment, upgraded electrical infrastructure, and a transition away from central heating and cooling.
PROJECT PHOTOGRAPHY
The Warwick slideshow.
01 / 10

The Warwick Apartments · Silver Spring, MarylandPhotographs provided by TEC