TOOMEY ENGINEERINGCORPORATION
Project profile / Clean Energy & Electrification

Monticello Lee Apartments

All-Electric Conversion and Building Systems Modernization

Saint Asaph Street, Jefferson Street & South Washington Street, Alexandria, Virginia
View photo slideshow
Monticello Lee apartment buildings and courtyard on South Washington Street in Alexandria, VirginiaMonticello Lee Apartments · TEC project photography
THE PROJECT

Modern systems for established communities.

TEC provided mechanical and electrical engineering design for the all-electric conversion of six Monticello Lee apartment buildings in historic Alexandria, Virginia. The three-phase modernization replaced central gas-fired boiler systems and low-efficiency window air conditioners with individual 19 SEER2 variable refrigerant flow (VRF) heat pump systems serving apartments and laundry facilities.

6Residential buildings
3Project phases
19 SEER2VRF heat pump systems
725Metric tons/year · TEC-reported emissions reduction
01

The challenge

Coordinate the transition to electric heating and cooling across three residential sites while integrating rooftop outdoor equipment, indoor units, refrigerant piping, equipment supports, and the electrical infrastructure needed for the conversion.

02

TEC’s approach

  • Develop coordinated mechanical and electrical design documents for the three-phase modernization.
  • Replace central gas-fired boilers and window air conditioners with individual 19 SEER2 VRF heat pump systems.
  • Coordinate rooftop equipment arrangements, mounting supports, refrigerant piping routes, and indoor unit locations.
  • Integrate equipment power requirements with apartment load centers, metering, and electrical distribution.
  • Provide building-envelope and building-systems energy analysis to support Virginia Housing Innovations in Energy Efficiency (HIEE) funding.
03

Three-phase project scope

  • Phase I · Saint Asaph Street — VRF heat pump design for 38 apartments and laundry facilities at 724 South Saint Asaph Street.
  • Phase II · Jefferson Street — VRF heat pump design for 17 apartments and laundry facilities at 605 Jefferson Street.
  • Phase III · South Washington Street — VRF heat pump design for four buildings at 800A, 800B, 800C, and 800D South Washington Street, with 26 apartments and laundry facilities in each building.
04

A transition from central boilers to efficient electric systems

TEC’s project narrative reports decommissioning central boiler plants across the six buildings, an improvement in overall energy efficiency from 60% to 95%, and an estimated reduction of approximately 725 metric tons of carbon emissions per year. The modernization combines efficient apartment heating and cooling with coordinated rooftop installations and electrical infrastructure upgrades.

CONTINUE EXPLORING

The Warwick Apartments

View all projects
LET’S TALK ENGINEERING

A better building starts
with a clear conversation.

Discuss your next modernization, electrification,
or building systems project with TEC.

gtoomey@toomeycorp.com301-620-28012410 Cobblestone Way
Frederick, Maryland 21702